Drill very carefully and steadily straight up between the brick and plaster, then drill horizontal between the brick and plaster under the lintel, that just leaves a couple of small holes to fill. If it's papered then wet and slice a small strip back. Coving as above mentioned, lift a board if you can and have a look around before carefull drilling with a 400mm x 5mm bit up.