Great , so lock all panels and no one can prove who locked it and how the programming was done last or by who
Seeing as hkc doesn't have a back door , unless you know of one (barring being connected to securecom and know your remote code not exactly a back door tho)
How many zones in use? Just wondering, as even if you change engineer code flaff around when you can change the panel in less time and find faults easier with new panel
On hkc you can what's called a technical zone ,
I use this on gates to send a signal to the app each time the gate is operated
Perhaps something like that is on the enforcer?