Jump to content
Security Installer Community

Nova-Security

Trade Full Member
  • Posts

    3,344
  • Joined

  • Last visited

  • Days Won

    24

Everything posted by Nova-Security

  1. Possibly C4 / C7
  2. See which terminal is linked to the transistor then that should be your sounder output Does the chip have 555 on it, as with a couple of caps that your timing circuit so your trigger would go to that chip
  3. They dont seam to have the power anymore to enforcer things, most of the manufactures have have somebody sat on a BS committee and make the regs to suit their panels. If they did manage to do something it would end up like the fire protocols, 3/4 that you can buy of the shelf which are not compatible with each other and the big firms tie it down to their own.
  4. Could be the smart RIO PSU card (one on the right) if its the newer switch mode PSU, seen a few with a dodgy capacitor.
  5. Only every company I have heard of that was developing a G4 detector that sit on the control panel data BUS was risco, but this was when the Grading first came out. Iam glad they didnt make one would have been a joke. Worked in a few banks where they have PACOM panels, and the detectors are still 1980s C+K dualtecs which must be wired EOL as they wont have any sort of data bus between the two. Encrypted protocol wont happen in this country, unless a manufacturer who makes both panels and detectors does it, Thorn had encrypted RIOs for Galaxy think that the nearest anybody has got to it.
  6. PACOM ACHIEVES HIGHEST EUROPEAN SECURITY GRADE FOR INTRUSION DETECTION EN50131 GRADE 4 APPROVAL. PACOM SYSTEMS® are pleased to announce the 8002 Intelligent Field Controller and associated devices have been awarded EN50131 Grade 4 approval – the highest European standard for intruder alarm securityand signalling. As for detectors Siemens do a grade 4 (never seen one ) A grade 3 system correctly installed would surfice any building with ATS 4/5 CPNI approved detectors are just as rare. Just seen this is public so taken a lot out.
  7. Not all potted, but I would have thought they should be
  8. Start with a scantronic 9651 / texecom veritas r8 / honeywell G4
  9. The early pre dimension could be bought with or with comms onboard C for comms and as GG stated they didnt have any rear off wall tamper. Well that how we always order them.
  10. C is for comms onboard, D is dimension
  11. Horrible tan colour front Do remember having the instructions for them once
  12. Google is your friend https://www.security.honeywell.com/uk/product-repository/galaxy-touchcenter-plus Think the cp040 is dimension only https://www.security.honeywell.com/uk/-/media/SecurityUK/Resources/PDF/Customer-Product-Information-Bulletins_updated/CPIB026_CP040-CP041_TouchCenter_Update-pdf.pdf?la=en-GB&hash=0D994C439A7B6403B15DF510D46D15A403A0F842
  13. There was a Tech bulletin from Honeywell a few weeks back about them changing servers and details needed updating.
  14. Have a look at group status 53 - 7, should be a - for outputs to work all the time
  15. If the outputs are assigned correctly for that area have you got a bell delay programmed What does not sound e/e or alarm tones ?
  16. Have a look for a Door RAS ATS1170 they have a RTE button input which is timed programmable
  17. Airitech need the 4K7 EOL if the zone isnt used, not like a Galaxy where you can spare it with nothing in the zone
  18. Airitechs need to see a 4k7 EOL even if the circuit is programmed as unused.
  19. Irrigation system covered Next, artificial lighting and electric meter by pass
  20. Yep, but what these governing bodies dont realise is people dont want visitors in to their premises.
  21. FIA Update https://www.fia.uk.com/news/fia-assured-by-home-office-that-personnel-responding-to-failures-of-fire-protection-systems-are-definitely-designated-as-key-workers.html?fbclid=IwAR3v8zomhOyi-pljOJITqlT-qYMQdohsSg-rjQcWF0FhgtQ7LawOCamjbrQ
  22. NSI bullentin 12/20 received today if I have read it right they want you out working, "if your figures fall below or cant show the decrease was genuinely COVID-19 related the auditor will expect to see a plan for improving your routine maintenence performance".
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.