funster Posted April 5, 2008 Posted April 5, 2008 Hi all, Can anyone help with a bit of advise on installing a 9651 panel and 9940 RKP. Just need to know where to connect the tamper, if I need to as the manual says link out both panic and tamper if an external panic is not being fitted? Thanks in advance Gary
Woosh Posted April 5, 2008 Posted April 5, 2008 Just connect 12V 0V Data Clock The RKP tamper is controlled via the bus.
Alarm Co Posted April 6, 2008 Posted April 6, 2008 Hi all,Can anyone help with a bit of advise on installing a 9651 panel and 9940 RKP. Just need to know where to connect the tamper, if I need to as the manual says link out both panic and tamper if an external panic is not being fitted? Thanks in advance Gary the tamper is above zone 1 and is only used for global tamper, doesnt need linking out if you use eol the pa is progd to zone 8 so if you dont use this zone you will have to go into zone program setting and change to nu/not used there is no seprate pa input on the board as other panels as with the keypad just conect 0v 12v clk data clour for colour at rkp and panel you will find 4 terminals at bottom of pcb, this is keypad terminals 9940 has in built prox reader i asume you know this you should be supplyd with one in box hope this helps
funster Posted April 13, 2008 Author Posted April 13, 2008 Thanks for the replies chaps, I wasnt expecting them so quick so thought I would leave it a week before checking. Will give it a go tomorrow and hopefully have it up and running. Thanks once again.
funster Posted May 12, 2008 Author Posted May 12, 2008 Hi Chaps, would just like to say thanks for the replies. All sorted now. Thanks again Gary
Recommended Posts
Archived
This topic is now archived and is closed to further replies.