broadband Posted October 18, 2010 Posted October 18, 2010 I don't have access to the trade sections. Hopefully someone here can help me. I was wondering how many hours you think it would take to install door access. We are using an ICS Security 10002 maglock, Siemens (Bewator) DC-12, SP500 switchplate reader, REX and BGU. Assume all cabling is in place except for the maglock. Using some steel and some wood frames and all wooden doors. For the maglock cable, we would have to drill up through the frame into a partition and fish the cable down. So, we would mount the door controller and psu above the door in ceiling void (ceiling tiles), wire and fix reader, rex and bgu, wire up the controller and psu and connect power from local spur. Thanks in advance.
norman Posted October 18, 2010 Posted October 18, 2010 your fired! Nothing is foolproof to a sufficiently talented fool.
Guest Oxo Posted October 18, 2010 Posted October 18, 2010 lol,I was assuming the person had not done this before. If all cables in place as mentioned one hour with correct tools and knowledge
broadband Posted October 18, 2010 Author Posted October 18, 2010 Thanks for the speedy replies. So, which should I be using? Is three hours a fair estimate to install all items, drill for the maglock cable and fish it, connect everything up and make sure the maglock lines up with the strike?
norman Posted October 18, 2010 Posted October 18, 2010 I would allow ½ a day Nothing is foolproof to a sufficiently talented fool.
Guest Oxo Posted October 18, 2010 Posted October 18, 2010 If your not used to this type of installation then 3 hours is a reasonable time. You cannot really go wrong with a mag lock if you use the fitting template supplied. You mention metal frames,make sure you have a selection of HSS bits and a "tapping device".
arfur mo Posted October 18, 2010 Posted October 18, 2010 I'm this you 1st maglock? make sure you have the rright size drill/flat bit for the armature stud so it wil be a tightish fit and need a tap, be careful to align the armature bang on centre with the mags field, a little more time spent here is usually a lot more saved later. allow the armature to flex (but not flop about on it's stud), in order for it to best mate flat with the magnet. Don't forget threadlock for the bolts Arfur If you think education is difficult, try being stupid!!!!
james.wilson Posted October 18, 2010 Posted October 18, 2010 Id also say half a day. You will loose an hour getting started and clearing up securitywarehouse Security Supplies from Security Warehouse Trade Members please contact us for your TSI vetted trade discount.
Recommended Posts
Archived
This topic is now archived and is closed to further replies.