jb-eye Posted December 4, 2012 Posted December 4, 2012 You'll be using a lighter to solder next JeffSounds like a plan.OK! Peter sussed me. But I have been known to drill a 20mm hole in a YT2 lid and place it inside the transom of a Ali door to hold down a flush contact Customers!
PeterJames Posted December 4, 2012 Posted December 4, 2012 We always mount cameras so that they cannot be sabottaged by lifting the ceiling tile.
jb-eye Posted December 4, 2012 Posted December 4, 2012 We always mount cameras so that they cannot be sabottaged by lifting the ceiling tile.you wire in armour flex and fix cameras to grid Customers!
MrHappy Posted December 4, 2012 Posted December 4, 2012 both are ****, however the bare twisted joint for the cam's power wins the rosette for shoddiness ? Mr Veritas God
alterEGO Posted December 4, 2012 Posted December 4, 2012 I have yes, two bits of trunking though And i was the pro, the others would use red raw plugs!
norman Posted December 4, 2012 Posted December 4, 2012 If you were any good you would only need one! Nothing is foolproof to a sufficiently talented fool.
PeterJames Posted December 4, 2012 Posted December 4, 2012 you wire in armour flex and fix cameras to grid We dont use armour flex we do fix to the grid or across the grid, I have seen lifted tiles with 360 pirs attached in the past
Alarm Protection Posted December 4, 2012 Posted December 4, 2012 Tut tut!, I thought the nacoss gold boys were a higher standard and compared silver to ssaib? Just proves that this whole industry needs sorting IMO so everyone works to a standard. It is just a joke now with all these rules. We need one governing body that companies work to the rules. !
jb-eye Posted December 4, 2012 Posted December 4, 2012 Tut tut!, I thought the nacoss gold boys were a higher standard and compared silver to ssaib? Just proves that this whole industry needs sorting IMO so everyone works to a standard. It is just a joke now with all these rules. We need one governing body that companies work to the rules. Standard. Anyone know what it means? 50 systems before approval process or 3. Who cares when either way you get authorisation to do the same thing. If you have to compete with someone offering your customer base a 50% undercut then something is likely to suffer. Customers!
alterEGO Posted December 5, 2012 Posted December 5, 2012 If you were any good you would only need one!It was a PTZ.
Recommended Posts
Archived
This topic is now archived and is closed to further replies.