Jump to content
Security Installer Community

Recommended Posts

Posted

Did a takeover years ago that had Racal detectors all wired in 16 core, extra 4 colours were stripey on white, and it wasn't phone cable.

So, I've decided to take my work back underground.... to stop it falling into the wrong hands

 

Posted

I went to a job yesterday service by a company with three letters. They have a G2-44 and a Fox PIR!! Now who is going to admit being old enough to remember the Fox !

Posted

I went to a job yesterday service by a company with three letters. They have a G2-44 and a Fox PIR!! Now who is going to admit being old enough to remember the Fox !

 

1st **** we fitted £26 ish IIRC?

 

post-17668-0-42162600-1448564130_thumb.j

 

not something we fitted but changed to e-line earlier this year

Mr th2.jpg Veritas God

Posted

ahh, bit of wood in the way there.

I have rounded off my fair share of terminal screwdrivers while cutting a little channel into the ceiling, slotting the cable in and filling in...

Posted

Was in an 80s new build finishing off today, started Tuesday and there was the remains of an old 2 zone type key system but nothing worth reusing cable wise, redone from scratch.

 

Lol at them bashing multiple holes with a hammer for mains from roof until they worked out where the joist was. Tiny ceiling so not visible without ladder and shelving removed.

So, I've decided to take my work back underground.... to stop it falling into the wrong hands

 

Posted

Was in an 80s new build finishing off today, started Tuesday and there was the remains of an old 2 zone type key system but nothing worth reusing cable wise, redone from scratch.

Lol at them bashing multiple holes with a hammer for mains from roof until they worked out where the joist was. Tiny ceiling so not visible without ladder and shelving removed.

Come on man , I told you I am the house basher

Posted

I have rounded off my fair share of terminal screwdrivers while cutting a little channel into the ceiling, slotting the cable in and filling in...

A now blunt 4.5mm HSS bit makes a tidy job of that if I need to.

Posted

I think its mad when just one core is used for a zone and all the cores are accounted for with power and all the zones using 1 core.

 

its nice and tidy at the panel end very few cables don't get me wrong but it isn't good when things start going wrong with the system.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.