Jump to content
Security Installer Community

Recommended Posts

Posted

Just out of interest, when taking a feed for the fused spur unit from a local socket, ring  main or even run back to the consumer unit on a dedicated circuit how many carry out electrical testing and issue either a minor works or installation certificate.

As approved electrical contractors this is something we always do however I’m convinced that attending existing alarm installations they have just banged the spur off what ever they can find and given no consideration to the testing.

The best one I’ve ever seen was when the installers had taken the supply from a bedroom socket and lifted the carpet and just cut a section out the underlay and dropped the carpet back down.

Posted
4 hours ago, Ppatrick said:

Just out of interest, when taking a feed for the fused spur unit from a local socket, ring  main or even run back to the consumer unit on a dedicated circuit how many carry out electrical testing and issue either a minor works or installation certificate.

As approved electrical contractors this is something we always do however I’m convinced that attending existing alarm installations they have just banged the spur off what ever they can find and given no consideration to the testing.

The best one I’ve ever seen was when the installers had taken the supply from a bedroom socket and lifted the carpet and just cut a section out the underlay and dropped the carpet back down.

The spur was already there.......?

Posted

Hi Patrick: Big problem is that a large proportion of installers don't know how to fit the spur correctly, never mind how to test when they're finished and probably don't have the equipment either. Don't know if it's still being done but a few of the installers around here used to just hang a length of 1mm t/e or 3 core flex off the nearest light, socket, cooker box etc to feed the panel. If you actually got a spur you were lucky & a 3 amp fuse was a luxury.

Customers Love us, Intruders Hate us.

Posted

Poor installation of the cable doesn't mean that it wasn't tested tho.

There is a big difference between wiring eight core or flex straight off the back of a socket (both I have seen) and a well installed 3A spur without a MWC IMO.

  • 3 months later...
Posted
8 hours ago, graeme stringer said:

as per BS7671 all new installs require a minor work or installation certificate and if the install is in a special location then it has to be Part P certified 

Yes mate we know this and ideally it would happen on every job, but unfortunately in the real world that's rarely the case. An awful lot of installers have never had any Training or Instruction on Safe isolation, Spur installation etc & I doubt they've ever seen the regs never mind opened them.

The other thing is: They don't have the test equipment or knowledge of it's use to be able to do the tests & provide certificates.

Customers Love us, Intruders Hate us.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.