Jump to content
Security Installer Community

Recommended Posts

Posted

Hi guys.

I'm installing my new Reson8 bell box and I have wired the wiring into the control panel (Honeywell flex) as per the instructions but there was no +12v in the terminal block for the bell in the panel so I put that wire into the intellibus +12v terminal just above it.

The bell box has been installed on the wall with the cable fed through but it's not been wired up yet as the weather changed.

But I did test the tamper wires and that worked and thought I would read +12v from that one.

I thought the bell monitored for power loss so presumed the 12v would be permanent am I right or wrong.

Thanks.

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.