Oxo Posted December 12, 2012 Posted December 12, 2012 My one where there was a smoke cloak and a MB in a high end fashion shop in Knightsbridge and no one nor the spec said anything about it. (TS2500) So bell test and BOOOOM................ Apparently I was the 4th engineer to do it. The owner was not very happy and I have never heard someone so posh swear so much Testing at a ISP HUB. GD520 in and there are 4 MB`s and the boss said let him know and he`ll leave his wife in there alone on the test (Both friends BTW Well almost not after the event with her ).
MrHappy Posted December 12, 2012 Posted December 12, 2012 Good idea for a topic what are the nominees top poster from houston texas ? Mr Veritas God
Zen Engineering Posted June 26, 2013 Posted June 26, 2013 We had something similar with a service on a fog cannon. Local bookies, isolated the cannon but whoever had wired the isolation had wired it wrong. Full clear out, took ages too as it was a nice day with no wind and only the front door to get it through.
Recommended Posts
Archived
This topic is now archived and is closed to further replies.