Tallbloke Posted March 25, 2006 Posted March 25, 2006 Hi, I'm fitting a system as a subbie and the kit specced by the surveyor includes A Honeywell G2 (first I've seen but I know Galaxy), power rio, 2 rios, two keypads and a siren. It has 25 standard DualTecs on it. I assume the RedGSM will go on it's own PSU. My mate reckons it's woefully underpowered. Your comments would be welcome. Rgds.
Tallbloke Posted March 27, 2006 Author Posted March 27, 2006 Ta, fella. Had another look now I have the drawings and it should be fine as long as I use the smart rio for the lion's share of the power. TB
Recommended Posts
Archived
This topic is now archived and is closed to further replies.